I would like to use a copper pre heater block instead of aluminum, it transfers heat almost twice as good. wont cost a million and is still easy to work with as far as machining goes.
I also would like to use a small heating element say 200 watts 120 v with a thermal couple and temp controller. the oil would flow in a u shape around the element twice through the block and then off to the thermal couple and out the siphon nozzle. I believe it would be efficient in heating the oil but am not sure about the wattage rating being enough.
I intend to flow about 1.5 gal an hour possibly more depending on heating demands.
Another thought run a tube through the fire box with the by pass oil from the pump to help with pre heating, located in such a way that it wont over heat the oil.
Any help would be great thanks in advance